Implemented projects

Largest facilities

100
10
4

Our projects

In 15 years of operations we have executed more than 100 projects of automated radiation monitoring systems implementation in Russia and abroad

Countries of presence

Key projects

We have completed projects on the most complicated facilities in 4 countries

Busher NPP

Results

- New technological solution on systems implementation and their further integration meeting world-class standards.
- Successful implementation of integration, cooperative projects with the NPP are still going on.

Project goals

- Integration of the ERMS on all three NPP units
- Primary and back-up ERMS systems unification

Novovoronezh NPP

Results

New system design, corresponding the new NPP project & approach. Supplied, implemented and configured systems of the integrated radiation monitoring systems, that are in use from thereon

Project goals

- Overall supply of software and hardware
- Integrated and precisely configured systems of the upper and lower levels with an absolutely new structure
- World's first-of-a-type structure, the completely new approach to the radiation monitoring system's architecture

2006-2011
2006-2011

"Kudankulam" NPP

Results

- An individual integrated solution supplied and commissioned on "Kudankulam" NPP units №1, №2.
- Custom-made software design based on requirements of "Kudankulam" NPP staff & personnel

Project goals

- Implementation of the new equipment of the upper level as well as advanced software apparatus
- Integration of upper and lower levels
- Post-Fukushima safety class for the systems

2004-2016
Full projects lits
Kudankulam NPP, Republic of India
  • Commissioning, installation and supervision of the ARMS (2016)
  • ARMS equipment supply (2014)
  • Commissioning of ALMS (2014)
  • Manufacture and supply of equipment for the radiation control stands complete with sampling probes for power units №1 and №2 (2010)
  • Design and supply of the Leakage isolation system from primary circuit to secondary (2010)
  • Elaboration of Technical project in part of the ERMS (2009)
  • Elaboration of the technical project in the part of ERMS (2009)
  • Elaboration of Technical assignment of LMS (2008)
  • Installation of the ARMS on unit №1 (2008)
  • Initial date for the leakage isolation system (2008)
  • Technical specifications and initial data of the ARMS (2007)
  • Analytical report "Optimal scope of radiation monitoring"(2005)
  • Elaboration of Technical assignment of ERMS (2004)
Busher NPP, Islamic Republic of Iran
  • Implementation of the integrated ERMS (2017)
  • Spare parts supply for the LMS-2 (2014)
  • Supply of ERMS and IRMS spare parts and accessories (2012)
  • Supply of LMS systems (2011)
  • IRMS commissioning (2011)
  • Design and supply of software & hardware complex of the Leak monitoring system (LMS-2) on unit 1 (2010)
  • Supply of software and hardware for physical measurements at 1 block (2010)
  • Manufacture and supply of holders for radioactive sources (2010)
  • Manufacturing of metrological and laboratory equipment complete with technical documentation (2009)
  • Design and supply of software & hardware complex of ERMS-2007 (2006)
  • Development, manufacturing and supply of software and hardware of ERMS-2007 (2006)
  • Project documentation for a complex for processing liquid radioactive waste (2006)
  • Initial data elaboration for the design of ERMS and IRMS (2005)
  • Elaboration of Technical assignment in part of ERMS IRMS (2005)
  • Elaboration of Technical assignment of ERMS (2004)
  • Materials and the design of radiation monitoring system of NPP site and in the area of ERMS and IRMS deployment (2004)
Belene NPP, Bulgaria
  • Elaboration of Technical project in part of the ARMS (2008)
  • Elaboration of Technical project in part of the ERMS (2008)
NPP projects in Russian Federation
Rostovskaya NPP
  • ERMS maintenance and supervision (2013)
  • Software and hardware supply for ERMS (2010)
  • NPP 2nd stage ERMS elaboration outside the operating nuclear island (2008)
  • Initial data elaboration for the ERMS of the Rostovskaya NPP 2nd stage (2008)
Kalininskaya NPP
  • ERMS commissioning (2012)
  • ERMS supply (2010)
  • Elaboration of the initial data of Technical assignment of ERMS of the Kalininskaya NPP (2009)
Leningradskaya NPP
  • Supply of the radiation control equipment (2009)
  • Development of the Technical project for the radiation control into the ventilation stack (2008)
  • Supply of ARMS subsystem to the control post (2007)
  • Technical assignment for the radiation control into the ventilation stack, phase 1 (2006)
  • Technical assignment for the radiation control into the ventilation stack, phase 2 (2008)
Smolenskaya NPP
  • Supply of RKZ system equipment (2012)
  • Supply of ARMS lower level equipment (2011)
Novovoronezhskaya NPP
  • Supply of additional ARMS equipment (2016)
  • Supply of additional ARMS equipment (2015)
  • Supply of the installations (2013)
  • Supply of the ARMS spare parts (2012)
  • Supply of the ARMS upper level equipment (2011)
Other projects in Russian Federation
Mixed oxide and mixed fuel fabrication facility (MFFF), Zheleznogorsk
  • Supply of video monitoring system (2012)
  • ARMS systems supply in the buildings 13, 25, 26, 3А (2011)
  • Manufacturing and supply of hardware and software ARMS complex (2010)
  • Elaboration of the initial data of the ARMS upper level (2010)
Cancer/Oncology Center, Tyumen
  • ARMS maintenance (2013)
  • ARMS supply (2011)